Our venues

Blog

Lady Lever access progress

19 July 2007 by Karen

The installation of the new access ramp at the Lady Lever Art Gallery is continuing this week with the fitting of the new glass balustrade. Did a previous post on the ramp itself if you are interested.

a large piece of galss beign lowered into position and helped by a man

The first piece of glass is lowered into position

(Comments are closed for this post.)